Mounting kit for flush mounting behind the elevator cabin wall to conceal the retrofitted holes. To be used as a drilling template according to the 16 element standard edge design, incl. necessary mounting material as step drill, etc.
Delivery package:
- Drilling pattern cegard/Lift, STAINLESS STEEL, 2000mm
- Cover cegard/Lift, yellow-black, 1900mm
- Rubber profile, 16.5x5.6mm, L=1.98m
- Shipping kit backside mounting cegard/Lift
- Mounting instruction backside mounting cegard/Lift



